Posted on 12-Jun-2018

Carpet & Flooring Services Nottingham

Amtico herring bone vinyl flooring. Subfloor had to have a damp proof membrane rolled onto the top of the newly laid concrete floor then left to dry for 24 hrs.

Then a latex screed was applied on top of the DPM and left for a further 24 hrs.

We then laid the amtico flooring at Edwinstowe Nottingham